Active Projects
{{number}} projects identified for {{city}}
Modernize Police Endpoint & Technology Management
Public Safety Technology · IT Modernization
High Priority
About this project
The department operates in-car computers and body-worn cameras without confirmed centralized endpoint management, creating IT cost instability and operational risk. Rising technology costs are a cited driver of an upcoming ballot measure, and an ongoing IT and cybersecurity modernization initiative underscores the need for structured oversight.
The opportunity
A $4.6M police millage measure on the August 2026 ballot creates a time-bound procurement window explicitly tied to police technology costs, and existing cooperative purchasing agreements simplify acquisition. Federal grant programs aligned with public safety technology offer additional funding pathways to advance this initiative within the current fiscal cycle.
FY 2026 COPS TEP
Discuss this project →Patrol Fleet Telematics & Vehicle Safety Modernization
Fleet Management · Public Safety
High Priority
About this project
Patrol vehicle replacements have been deferred and no fleet telematics solution is confirmed, leaving the department without real-time safety monitoring or integrated evidence capture. This gap elevates liability exposure and operational risk while technology budget pressures continue to mount.
The opportunity
A police millage measure on the August 2026 ballot, explicitly citing equipment and technology costs, creates a near-term funding trigger for fleet modernization. The FY 2026 COPS Technology and Equipment Program offers an additional federal pathway, and an existing cooperative contract framework can streamline procurement and reduce administrative burden.
FY 2026 COPS TEP
Discuss this project →Cybersecurity and Access Control Modernization
Cybersecurity · IT Modernization
High Priority
About this project
A documented ransomware incident and the absence of centralized password and endpoint management represent critical security gaps for this township. The active IT and Cybersecurity Modernization initiative lacks confirmed tooling for credential and access control, leaving systems and public data exposed.
The opportunity
HSGP and EMPG grant pathways support cybersecurity and IT resilience investments, and an anticipated local funding increase signals near-term budget availability. Addressing these gaps now reduces operational and compliance risk while aligning with the current fiscal planning cycle.
Mass Notification System Consolidation
Emergency Management · Public Safety
High Priority
About this project
The township currently operates multiple fragmented mass notification channels with no confirmed contract renewal status and no publicly disclosed Emergency Management Coordinator on record. This fragmentation creates gaps in alert reliability, coordination, and preparedness documentation that elevate operational and public safety risk.
The opportunity
A near-term FEMA Hazard Mitigation Grant RFP, alongside HSGP and EMPG funding paths, creates a timely opportunity to consolidate notification infrastructure with limited local match required. Acting within the current grant window strengthens emergency response reliability and advances compliance with preparedness mandates.
Web Accessibility & Digital Portal Compliance
Digital Accessibility · Regulatory Compliance
High Priority
About this project
Public-facing digital portals have not achieved WCAG 2.1 certification despite an existing ADA program, leaving the township exposed to accessibility complaints and legal risk. Unresolved compliance gaps limit equitable access to government services for residents with disabilities.
The opportunity
Web accessibility remediation aligns with the current fiscal planning cycle and may be eligible for state or federal funding supporting digital equity initiatives. Addressing WCAG 2.1 gaps now reduces ongoing legal exposure and ensures public services remain accessible and compliant.