Active Projects
{{number}} projects identified for {{city}}
Fleet Telematics & Vehicle Safety Modernization
Fleet Management · Public Safety
High Priority
About this project
A recent patrol vehicle total loss and officer injury have exposed significant operational and liability risk within the department's fleet. Three newly approved police vehicles represent an immediate, funded need for in-vehicle telematics, cameras, and driver coaching capabilities to reduce future incidents.
The opportunity
Capital funding for three new patrol vehicles is already approved, making this a near-term, high-priority deployment window within the next 90 days. Grant programs such as TEP and JAG may offset additional technology costs, supporting responsible stewardship of public safety resources.
COPS Office TEP
Discuss this project →Emergency Operations Plan and Mass-Notification Gap Remediation
Emergency Management · Public Safety
High Priority
About this project
The township lacks a published Emergency Operations Plan and a township-managed mass-notification system, creating critical gaps in incident communication and coordination. Without these foundational tools, the entity faces elevated operational risk and potential loss of federal preparedness funding tied to NIMS compliance mandates.
The opportunity
A county-level EOC initiative already underway creates natural momentum for aligning township-level emergency management improvements. FEMA preparedness grants and state emergency funding offer viable pathways to address these gaps with limited local match, making the current fiscal cycle an ideal window to act before compliance consequences escalate.
FEMA HSGP
Discuss this project →NIMS Compliance & Federal Preparedness Funding Retention
Emergency Management · Grant Compliance
High Priority
About this project
This entity faces a mandate to implement the National Incident Management System (NIMS), with non-compliance directly threatening the retention of federal preparedness funding. Compounding this risk, identified gaps in emergency operations planning and mass-notification readiness elevate both operational and compliance exposure.
The opportunity
Federal preparedness funds—including FEMA's HSGP and BRIC programs—are available to support NIMS-aligned emergency management initiatives, but compliance must be demonstrated to remain eligible. Acting within the current budget and grant cycle protects existing funding, closes preparedness gaps, and strengthens community resilience.
FEMA HSGP
Discuss this project →Web Accessibility Compliance for Public Digital Services
Digital Accessibility · Regulatory Compliance
High Priority
About this project
A state mandate requires WCAG 2.1 Level AA compliance across all public-facing digital portals, creating an ongoing obligation for equitable access to government services. Without a structured remediation plan, the entity risks non-compliance and potential exclusion of residents with disabilities from essential online resources.
The opportunity
Aligning this initiative with the upcoming annual budget cycle allows for planned, cost-effective remediation before compliance pressure escalates. Proactively addressing accessibility gaps improves equitable service delivery, reduces legal exposure, and may qualify for state or federal digital equity funding.
Mass Notification System Implementation
Emergency Management · Public Safety
High Priority
About this project
The township currently lacks a dedicated, township-managed mass notification system, creating gaps in incident communication and coordination. This absence elevates operational risk and conflicts with NIMS compliance requirements, which carry consequences including the potential loss of federal preparedness funding.
The opportunity
NIMS compliance mandates and active emergency management funding programs—including FEMA's HSGP and BRIC—create a timely pathway to address this gap with limited local match required. Acting within the current grant window strengthens community preparedness, reduces compliance exposure, and supports long-term operational continuity.
FEMA HSGP
Discuss this project →