Active Projects
{{number}} projects identified for {{city}}
County Emergency Operations Plan Modernization
Emergency Management · Public Safety
High Priority
About this project
The county is mandated to develop a new Emergency Operations Plan and must maintain NIMS compliance to remain eligible for federal preparedness funding. Gaps in broad public alerting beyond IPAWS, combined with recent leadership transitions in key emergency management roles, elevate operational and continuity risk.
The opportunity
Active grant opportunities aligned to emergency preparedness — including hazard mitigation and infrastructure resilience programs — support this initiative with available federal funding. Acting within the current grant cycle strengthens compliance standing, reduces coverage gaps, and positions the county for sustained preparedness investment.
Mass Notification System Modernization for County-Wide Alerting
Emergency Management · Public Safety
High Priority
About this project
The entity currently depends on a county-level alerting platform for mass notification, creating a potential gap in standalone public alerting capabilities beyond IPAWS. A mandated new County Emergency Operations Plan and NIMS compliance requirements elevate the urgency of addressing this gap to protect residents and maintain eligibility for preparedness funding.
The opportunity
Active preparedness grant windows—including HSGP and BRIC-aligned opportunities—support mass notification modernization with potential to offset local costs. Acting within the current fiscal cycle aligns with the county EOP mandate, recent leadership transitions in emergency services, and strategic public safety infrastructure investments already underway.
Web Accessibility & Digital Portal Compliance
Digital Accessibility · Regulatory Compliance
High Priority
About this project
The township faces a DOJ-driven mandate to meet WCAG 2.1 Level AA website accessibility standards, with formal procurement of accessibility software scheduled for a second reading in July 2026. Failure to comply risks legal exposure and excludes residents with disabilities from essential public services.
The opportunity
The July 2026 procurement timeline creates an immediate window to act within the current fiscal cycle, with solutions potentially eligible for state technology or equity-focused funding. Addressing this now reduces legal and compliance risk while ensuring equitable digital access for all residents.
Sourcewell
Discuss this project →Fleet Telematics & Transportation Safety Modernization
Fleet Management · Public Safety
High Priority
About this project
The township's fleet currently lacks dash cameras and telematics, creating an undocumented operational safety gap across vehicles. A planned $1.6M aerial ladder truck acquisition signals active fleet expansion without modern safety technology in place, elevating liability and oversight risk.
The opportunity
The funded ladder truck purchase creates a natural entry point for first-time telematics deployment with no incumbent systems to displace. Acting within the current capital budget cycle allows the township to establish fleet safety infrastructure aligned with public safety facility investments and cooperative procurement vehicles.
Sourcewell
Discuss this project →Public Safety Facility & Infrastructure Modernization
Public Safety · Capital Infrastructure
High Priority
About this project
A $350,000 state appropriation has been allocated for a Consolidated Public Safety Facility, representing a significant capital investment with downstream IT infrastructure needs. A planned 2027 E911 UPS replacement signals additional operational continuity requirements critical to uninterrupted emergency communications.
The opportunity
Active state appropriations and a defined facility project create a near-term capital budget window aligned with the current fiscal cycle. Coordinating physical and IT infrastructure investments now maximizes public safety outcomes, supports E911 continuity, and positions the entity for eligible preparedness funding.
Sourcewell
Discuss this project →